NCPE supervised more than 150 projects on power generation and power transmission since 1988, most of which were supervision of design and construction of coal-fired and gas-fired power plants, 220KV-500KV high voltage and ultra-high voltage transmission lines and construction of power transmission sequences.
Power generation: (发电)
- Whole process supervision including engineering design and construction process of Huarun Liuzhi Power Plant (2×1000MW, desulfuration included)
- Engineering design supervision of Shanghai Waigaoqiao Power Plant (2×900MW)
- Engineering design and construction supervision of Guohua Dingzhou Power Plant (2×600MW)
- Engineering design supervision of Datang Jiangsu Sigang Power Plant (4×600MW)
- Engineering design and construction supervision on Huarun Henan Shouyangshan Power Plant (2×600MW, desulfuration included)
- Construction supervision of Huaneng Wuhan Yangluo Power Plant (2×600MW, desulfuration included)
- Engineering design supervision on ultra-supercritical of Huadian Anhui Wuhu Power Plant (2×660MW)
- Engineering design supervision of Henan Nanyang Tianyi Power Plant (2×600MW)
- Construction supervision of Guodian Nanning Power Plant (2×600MW, desulfuration included)
- Engineering design and construction supervision of Shanxi Huozhou Power Plant 2nd stage (2×600MW, desulfuration included)
- Engineering design and construction supervision of Hunan Yiyang No.2 Power Plant (2×600MW, desulfuration included)
- Engineering design and construction supervision of Datang Changshan Power Plant (2×660MW, desulfuration included)
Project Management: (项目管理)
- Project management supervision of Shenhua Ningmei Power Generation Project (2×25MW)
- Project management supervision of Shougang Jingtang Steel Factory Power Station Project (2×300MW)
- Project management supervision of comprehensive utilization of gangue of Shanxi Shanyin Power Plant (2×300MW)
- Project management supervision of Shanxi Gujiao Power Generation Project (2×600MW)
- Project management supervision of Sri Lanka Puttalam Power Station Project (1×300MW)
Wind Power: (风电)
- Engineering design and construction supervision of Inner Mongolia Huitengxile Wind Farm 1st stage (100MV)
- Engineering design and construction supervision of Jiangsu Dongtai Wind Farm 1st stage (200MV)
- Engineering design and construction supervision of Huadian Hebei Guyuan Power Station 1st stage (100MV)
Desulfuration: (脱硫)
- Engineering design and construction supervision of Shenzhen West Power Plant 5#, 6# (2×600MW)
- Construction supervision on desulfuration, denitration, decarbonization of Huaneng Beijing Heating and Power Plant (4×200MW)
- Design and construction supervision on desulfuration of Huaneng Wuhan Yangluo Power Plant 1st and 2nd stage (4×300MW)
- Construction supervision on desulfuration of Huaneng Yangliuqing Power Plant 3rd stage (2×300MW)
- Construction supervision on desulfuration of Shanxi Yangcheng Power Plant (6×350MW)
Transmission and Substation: (送电变电)
- Supervision of Beijing Changping 500KV Substation 3rd stage
- Construction supervision of Zhangjiafang - Shunyi Double-circuit 500KV Transmission Line Project
- Engineer and construction supervision of Sanxia Jingmen – Jingzhou 500KV Transmission Line Project
- Engineer and construction supervision of Jingmen – Xiaogan 500KV Transmission Line Project
|